MASCO completed an intermodal pilot using port release at Dar es Salaam, SGR linehaul to Dodoma, and final-mile trucking to inland destinations.
-
1
Integrated Port-to-Rail Handover
Container release and rail loading schedules were synchronized to limit waiting time between legs.
-
2
Rail Linehaul for Bulk Movement
SGR leg was used for high-volume cargo to improve consistency and reduce long-haul road pressure.
-
3
Inland Truck Dispatch Control
Arrival alerts from rail terminals triggered pre-planned truck dispatch windows for final delivery.
-
4
Transit-Time Tracking
Operations reporting showed improved planning accuracy versus road-only movement for similar cargo types.
-
5
Scale-Up Plan
The pilot framework is being prepared for additional inland corridors where intermodal flow is commercially viable.